topic: ES

Search

Filter alphabetically:

Year:

Project Controls 2.0 is failing. This presentation introduces PC-3.0, a paradigm shift focused on proactively driving future success rather than reporting on past failures. Learn about Work Performance Management (WPM), a simple, adaptive control method that enables rapid corrective action to keep projects on track for success.
How can formal standards enable agility and accelerated delivery? This presentation showcases the new ISO EVM Implementation Guidance, debunking myths about Agile and EVM incompatibility. Learn how data-driven discipline from ISO standards is essential for diagnosing delays, identifying acceleration opportunities, and successfully delivering capability at speed.
A commercial validation of the use of EV and ES to enhance project performance.
Topics: 
An evaluation of the benefits of applying Earned Schedule to airport construction works.
Topics: 
Earned Schedule is an extension to Earned Value Management (EVM) which provides accurate time based metrics. This presentation includes an overview of the history of the global collaboration, the capabilities, benefits and challenges of the method, and its present status in global project management practice.
Topics: 
Advances in science have been made through the practice of the scientific method; that is, through the proposition of theory followed by experimental testing to either, support and validate the proposition, or refute it. The common denominator in this process is the use of measures. This presentation discusses specific advances
Topics: 
Topics: 
An overview of the impetus for creating Earned Schedule, the process and the challenges.
Topics: 
Understanding, and calculating the effect of out-of-sequence work on the reliability of Earned Schedule data. Defining the P-Factor'.
Topics: 
This presentation details recent analysis using real data that has shown that the value 1.10 for TCPI and the To Complete Schedule Performance Index (TSPI) from Earned Schedule is a definitive and reliable performance threshold. This presentation describes the use of Earned Value Management/Earned Schedule project performance measures with the
Topics: